E10-PC-52: Pilot Framework Guidelines on Electricity Grid Connection

2010/07/14 - 2010/09/24

Background

Pilot Framework Guidelines on Electricity Grid Connection

At the heart of the 3rd Legislative Package is the development of EU-wide network codes on topic areas for the integration of EU electricity and gas markets, enabling cross-border trade and competition to develop across EU energy markets. Upon a request from the European Commission, ERGEG is using the so-called interim period until the Agency for Cooperation of Energy Regulators (ACER) becomes fully operational to simulate the development of framework guidelines according to the provisions of the 3rd Package. ERGEG has therefore developed draft pilot framework guideline on electricity grid connection. This draft is accompanied by an initial impact assessment.

Grid connection covers all issues to establish and to maintain a physical connection between the transmission and / or distribution grid and the grid customers. Grid connection is used here as a synonym for network connection, which is the area for a network code according to Article 8.1.b of the Regulation (EC) 714/2009. In the context of this Initial Impact Assessment (IIA), grid connection requirements are considered as features and rules which the transmission and distribution grid operators, as well as the grid users have to meet, in order to maintain system security, availability and the proper functioning of the electricity market from a technical point of view.

ERGEG invites all interested parties to provide comments to the consultation paper (framework guidelines) – and in particular the 9 questions in the accompanying cover note. Any comments should be received by 24 September 2010 and should be sent by email to fg_pilot_electricity@ergeg.org.

Following the public consultation period, ERGEG will publish all comments received from stakeholders. If a respondent would like ERGEG to treat their contribution with confidentiality then this must be explicitly mentioned in their submission.

Any questions on these documents should in the first instance be directed to:

Mrs. Fay Geitona
CEER Secretary General
Email: fay.geitona@ceer.eu
Tel. +32 2 788 73 30
Fax +32 2 788 73 50

Consultation Documents

E09-ENM-18-04a
Cover Note and Consultation Questions for Draft Pilot Framework Guidelines on Electricity Grid Connection

E09-ENM-18-04
Draft Pilot Framework Guideline on Electricity Grid Connection

E09-ENM-18-03
Pilot Framework Guideline on Electricity Grid Connection - Initial Impact Assessment

E10-ENM-18-04
Final ERGEG Pilot Framework Guideline on Electricity Grid Connection, 7 December 2010

E10-ENM-18-04a
ERGEG Public Consultation on Draft Pilot Framework Guidelines on Electricity Grid Connection - Evaluation of responses, 7 December 2010

Public Responses

E10-PC-52-01
AEP

E10-PC-52-02
Alstom Grids

E10-PC-52-03
BDEW

E10-PC-52-04
Beacon Power

E10-PC-52-05
BNE

E10-PC-52-06
EDF Energy

E10-PC-52-07
EDF

E10-PC-52-08
Edison

E10-PC-52-09
Electricity North West

E10-PC-52-10
Elering OU

E10-PC-52-11
ENA

E10-PC-52-12
EnBW

E10-PC-52-13
ENERCON

E10-PC-52-14
ENTSO-E

E10-PC-52-15
EON

E10-PC-52-16
ERDF

E10-PC-52-17
EUCC

E10-PC-52-18
Eurelectric

E10-PC-52-19
EWEA

E10-PC-52-20
GEODE

E10-PC-52-21
Iberdrola

E10-PC-52-22
IFIEC and CEFIC

E10-PC-52-23
Liander

E10-PC-52-24
Nordenergi

E10-PC-52-25
ODE

E10-PC-52-26
PSE Operator

E10-PC-52-27
RWE

E10-PC-52-28
Swissgrid

E10-PC-52-29
Wartsila

E10-PC-52-30
COGEN Europe