E06-PC-16: Guidelines for Good Practice on Open Season

ERGEG Public Consultation 2006/12/07 - 2007/01/19

Background

On 7th December 2006 the ERGEG launched a public consultation on  Draft Guidelines of Good Practice for Open Season Procedures. Procedures. Open season procedures generally consist of a two-step process starting with an open assessment of market demand for a specific proposal (first step) and a subsequent phase of capacity allocation (second step).

These draft Guidelines were prepared on foot of a request of the  European Commission at the 11th Madrid Forum (18-19 May 2006). The guidelines aim at clarifying the role of open season procedures in light of Commission’s draft explanatory notes on Article 5 (1 – 5) as well as Annex 2.1 and 2.2 of Regulation 1775/2005/EC.

ERGEG invites all interested parties to comment on issues raised in the text.  If a respondent would like ERGEG to treat their submission with confidentiality, this must be explicitly mentioned.

Any comments should be received by 19th January 2007 and should be sent to:
openseason@ergeg.org 
 

Any question to this document should in the first instance be directed to: 

             Mrs Fay Geitona
             Email: fay.geitona@ceer-eu.org
             Tel. +32 2 788 73 30
             Fax +32 2 788 73 50

Consultation Documents

C06-GWG-29-05 / E06-PC-16-01
Draft Guidelines of Good Practice on Open Season Procedures (GGPOS)

C06-GWG-29-05c / E06-PC-16-17
Guidelines for Good Practice on Open Season Procedures (GGPOS), 21 May 2007

C06-GWG-29-05b / E06-PC-16-17a
Evaluation of the Comments Received, 21 May 2007

Public Responses

E06-PC-16-02
GEODE

E06-PC-16-03
RWE Energy

E06-PC-16-04
RWE Transgas Net

E06-PC-16-05
The Romanian National Natural Gas Regulatory Authority (ANRGN)

E06-PC-16-06
Centrica

E06-PC-16-07
GIE

E06-PC-16-08
BG

E06-PC-16-09
EURELECTRIC

E06-PC-16-10
ENI

E06-PC-16-11
National Grid

E06-PC-16-12
EFET

E06-PC-16-13
EGL

E06-PC-16-14
Eurogas

E06-PC-16-15
Shell Energy Europe

E06-PC-16-16
NAM