E09-PC-46: Draft Pilot Framework Guideline on Capacity Allocation on European Gas Transmission Networks

ERGEG Public Consultation: 2009/12/18-2010/02/26

Pilot Framework Guideline on capacity allocation mechanism
Ref. E09-GNM-10-05

Pilot framework guideline on CAM - initial impact assessment
Ref. E09-GNM-10-06

Instructions how to respond to the public consultation
Ref. E09-GNM-10-05a

Background

Draft Pilot Framework Guideline on Gas Capacity Allocation on European Gas Transmission Networks

Upon a request from the European Commission, ERGEG is using the so-called interim period until the Agency for Cooperation of Energy Regulators (ACER) becomes fully operational to simulate the development of framework guidelines according to the provisions of the 3rd Package. ERGEG has therefore developed a draft pilot framework guideline on capacity allocation in gas transmission networks, which covers cross-border interconnection points between two or more Member States as well as interconnections between adjacent entry-exit-systems within the same Member State, insofar as the points are subject to booking procedures by users.

ERGEG invited all stakeholders to participate in its consultation on the draft pilot framework guideline.
All comments should be submitted by Friday, 26 February 2010 and should be sent by email to: fg_pilot_gas@ergeg.org.

Following the Conclusions of the 17th Madrid Forum, stakeholders were invited to send their comments to the ERGEG document on recommendations for guidelines on congestion management. This document is intended to serve as input for the Commission when revising the Annex of Regulation (EC) 1775/2005 regarding the rules on congestion management. The deadline for submitting comments was 31 March 2010

ERGEG  evaluated the comments received from stakeholders and revised the Recommendations on CMP

Any questions on these documents should in the first instance be directed to:

Mrs. Fay Geitona
CEER Secretary General
Email: fay.geitona@ceer.eu
Tel. +32 2 788 73 30
Fax +32 2 788 73 50

Consultation Documents

E10-GWG-67-03
Evaluation of Comments received on Public Consultation, 29 June 2010

Public Responses

E09-PC-46-01
Alpiq Swisstrade

E09-PC-46-02
BDEW

E09-PC-46-03
BP

E09-PC-46-04
Centrica

E09-PC-46-05
Dong Energy

E09-PC-46-06
E.ON

E09-PC-46-07
EDF Energy

E09-PC-46-08
EDF

E09-PC-46-09
Edison

E09-PC-46-10
EDP Gás & Naturgas

E09-PC-46-11
EEX

E09-PC-46-12
EFET

E09-PC-46-13
EnBW

E09-PC-46-14
ENI

E09-PC-46-15
ENTSOG

E09-PC-46-16
EURELECTRIC

E09-PC-46-17
Eurogas

E09-PC-46-18
ExxonMobil

E09-PC-46-19
GasTerra

E09-PC-46-20
Gaselys

E09-PC-46-21
Gazprom

E09-PC-46-22
GDF SUEZ

E09-PC-46-23
IBERDROLA

E09-PC-46-24
National Grid

E09-PC-46-25
POWEO

E09-PC-46-26
RWE Supply Trading

E09-PC-46-27
Scottish Southern

E09-PC-46-28
Statoil

E09-PC-46-29
Trans Adriatic Pipelines AG

E09-PC-46-30
VNG Verbundnetz Gas

E09-PC-46-31
Yara

E09-PC-46-32
Shell

Public Workshop

Workshop Draft Agenda

Presentation of the results of GTE+'s online survey on capacity allocation - Thomas L'Eglise

ERGEG pilot FG on CAM - Benoit Esnault

ERGEG CMP recommendations- Fiete Wulff

ENTSOG reactions to ERGEG proposals on CAM and CMP- Ralph Bahke

EFET view on CAM and CMP

Eurogas view on CAM and CMP- Ralf Presse